Feel free to add comments and give suggestions. All opinions and ideas are welcome.

Sunday, April 29, 2012

The attic is done.... well almost!


 April 29, 2012

Nothing in this house is probably going to be totally finished (ever), but the attic is ALMOST there!!  Here it is:

Check out that floor. Woo hoo!!!  It is completely finished!




Here is what's left in the attic:
 
Need to finish the beams.  That can wait, although the wood they are storing probably needs to be moved.


Although you can't really tell, the windows are a mess. Fortunately, we really don't need them to open and they aren't painted. They just have large spaces for water/bugs to get in and air to get out.  This will be fixed sooner rather than later.

 Ditto on this window. There's about an inch gap around the bottom.

 The attic bathroom is almost there!  The tile needs grouted and the clawfoot tub needs re-painted on the outside.  Eventually, there will be molding, etc but we aren't that fancy right now ;-)

Alok, with the help of his diligent helper Charla, has been working on what I'd like to call his "house baby" aka the black and white tile in the kitchen.  Lookin' good! 

 


In other news that is less exciting to you all, the radiators that were left in the bookshelves were removed!  Woo hoo! More storage and less old nasty-ness here we come:

Jessica

Friday, April 27, 2012

Kitchen tile

April 21, 2012

So, I have recently been the master of taking pictures and not uploading them to the blog. So I'm running about a week behind.  Also, the blog has a crazy new format, so hopefully all looks well.

Alok has been busy laying the black and white marble tile in the kitchen.  This is the tile that he picked out because he would "regret it forever" if we didn't buy it ;-)  Here it is:


I also attempted to take additional pictures of some of the painting, but it isn't showing as well (of course).  If you look straight ahead, you'll see a radiator in the bookcase.  We are getting those removed.  
 Front parlor


 Master bath

 
Part of the kitchen with newly painted trim.  Looking sooo much better!

In fun news, look at the space between the original floors and drywall.  Hmmm...... plaster is much thicker: 



 

The attic floor is coming along quickly:


Attic bathroom- Has been tiled (needs a bit of work) and then the bathtub needs to be painted.  

So, the question still remains, when are we moving in? Answer: Who knows!

What is still on our to-do list:

1) Finish the laid tile (e.g., grout, seal, etc): attic bathroom, apartment bathroom, bathroom under the stairs, and kitchen tile

2) Paint the rest of the kitchen, kitchen cabinets, butler pantry cabinet, apartment bathroom, hallway bathroom, yellow bedroom

3) Put in the stained glass window

4) Fix the stairs

5) Re-paint all window frames/seal them... only 61 to go!

6) Clean up all the crazy stuff that's laying around

7) Kitchen appliances installed/ all bathroom fixtures in the ones we're doing 

8) Get the laundry room ready



Big things that will continue/wait:

1) Siding/outdoor painting (we just spent 1 gazillion $$ at Sherwin Williams, so this will somewhat happen this summer)

2) Kitchen countertops (we may do cheap ones now)

3) Apartment floor (lay new wood)

4) All trim, etc to close up the 2 inch gaps in our floors

5)  master bath

6)  hallway bath

7)  Alok's office/bath

8) Yellow bedroom floor

Not to bad, right ;-)

Jessica

 




Monday, April 9, 2012

Oops!

A few days ago, my aunt said I hadn't posted in weeks. I assured her that I had. Apparently, this was saved and not posted. Here are pics from early April (really quick)

First, we have rooms that are painted (but too dark of pics)






Our attic bathroom was tiled!


Not to thrilling (sorry, running off to lunch). Will post more later!

Jessica