Feel free to add comments and give suggestions. All opinions and ideas are welcome.

Friday, June 24, 2011

The destruction zone...

June 23, 2011

Is now officially the CONSTRUCTION zone (see, aren't I clever!). Dare I say that we MAY be done destroying our house? Let's hope we can get rid of this soon:


Alok finished the small bathroom in the yellow bedroom:




Look at that area, all nicely demolished

And he removed the plaster from the area around the attic stairs. The lathe is staying up apparently, so here it is:


Attic stairs




Area when you walk into the attic

In terms of construction, we now officially have 2 major projects underway. 1 is plumbing all of the bathrooms (all 5.5 of them), and the other is installing the HVAC unit for the top 2 floors. Here is the progress:


Exciting toilet hole in the floor of the apartment bath. There are some pipes here too.


Toilet hole/pipes for the bathroom under the stairs

Here are the pipes in the dining room (for the upstairs bathrooms):







Pipes in the foyer for the master:


Pipes in the master bath:


Laundry room:


Upstairs hallway bath:

For the sink


Toilet hole in the distance


Shower drain

I should point out that these are all vents/drain lines. We're using Pexs for the water lines.

Bruening also started the duct work:



Closet where the HVAC will go



Here is the upstairs tour, with high-quality videography as per usual:



I should be a professional.

Jessica

No comments: