June 23, 2011
Is now officially the CONSTRUCTION zone (see, aren't I clever!). Dare I say that we MAY be done destroying our house? Let's hope we can get rid of this soon:
Alok finished the small bathroom in the yellow bedroom:
Look at that area, all nicely demolished
And he removed the plaster from the area around the attic stairs. The lathe is staying up apparently, so here it is:
Attic stairs
Area when you walk into the attic
In terms of construction, we now officially have 2 major projects underway. 1 is plumbing all of the bathrooms (all 5.5 of them), and the other is installing the HVAC unit for the top 2 floors. Here is the progress:
Exciting toilet hole in the floor of the apartment bath. There are some pipes here too.
Toilet hole/pipes for the bathroom under the stairs
Here are the pipes in the dining room (for the upstairs bathrooms):
Pipes in the foyer for the master:
Pipes in the master bath:
Laundry room:
Upstairs hallway bath:
For the sink
Toilet hole in the distance
Shower drain
I should point out that these are all vents/drain lines. We're using Pexs for the water lines.
Bruening also started the duct work:
Closet where the HVAC will go
Here is the upstairs tour, with high-quality videography as per usual:
I should be a professional.
Jessica