July 31, 2011
If only that's what this was....
Even though it won't take us back to the 80's (or just 1 year and 2 months), it will be very nice in the master bath!
The new hardware, which will be throughout the bathroom
Alok's also been busy building a small closet into the master bath:
That area to the left of the white pipe is a small closet
He also has been busy framing out our master bedroom closet, as seen here:
View into the closet
Our plumber should also be finished this week. I know know more about how water pipes run and the exact location in this house than I ever wanted to. Here they are in our master bedroom:
The shower has been installed in the hallway bath:
Bruening has also been working on finishing the installation of the duct work for the 2nd and 3rd floors:
New utility closet
Gas/water pipes (think) now running through
Here is the completed laundry room plumbing:
Here is the plumbing running through the yellow bedroom:
So, Alok was talking about this wall area (which is the left side of the pic above this one) and saying "I wish that we could do something cool here, but these beams are support for the roof"......then he proceeded to touch the post here and it completely came detached! Ha! Welcome to our house.....
Jessica