Is now officially the CONSTRUCTION zone (see, aren't I clever!). Dare I say that we MAY be done destroying our house? Let's hope we can get rid of this soon:

Alok finished the small bathroom in the yellow bedroom:


Look at that area, all nicely demolished
And he removed the plaster from the area around the attic stairs. The lathe is staying up apparently, so here it is:

Attic stairs


Area when you walk into the attic
In terms of construction, we now officially have 2 major projects underway. 1 is plumbing all of the bathrooms (all 5.5 of them), and the other is installing the HVAC unit for the top 2 floors. Here is the progress:

Exciting toilet hole in the floor of the apartment bath. There are some pipes here too.

Toilet hole/pipes for the bathroom under the stairs
Here are the pipes in the dining room (for the upstairs bathrooms):



Pipes in the foyer for the master:

Pipes in the master bath:

Laundry room:

Upstairs hallway bath:

For the sink

Toilet hole in the distance

Shower drain
I should point out that these are all vents/drain lines. We're using Pexs for the water lines.
Bruening also started the duct work:


Closet where the HVAC will go

Here is the upstairs tour, with high-quality videography as per usual:
I should be a professional.
Jessica